These days we are finishing Phase A of the construction work designed to renovate the six upper courts at the tennis court area, out of a total of 18 courts.
This project involved soil replacement, infrastructure works, pavement, and coating. New lamp posts equipped with LED lighting have been added. Fences in and around the tennis court area have also been replaced. In addition, new, accessible pathways have been paved, further improving the overall level of the courts.